SearchSearch CalendarCalendar GalleryGalleryAuction-PortalAuctions GlobalGlobal Top-ListTopMembersMembers StatisticsStats
get your RSS-Feed
Language/Sprache:  Admin  
 Login: ChatChat (0) new User-MapUser-Mapsend Passwordsend Password RegisterRegister

Forum Overview » Beispiel-Kategorie / Example Category » Beispiel-Forum / Example Forum » Renovation after the floor cracking: is not paved or poor quality
Pages: (1) [1] »
Registration necessaryRegistration necessary
Renovation after the floor cracking: is not paved or poor quality
wangkikyno Access no Access first Post cannot be deleted -> delete the whole Topic 
Group: Administrator
Level:


Posts: 4873
Joined: 1/28/2015
IP-Address: saved
offline


Mr. Xu commissioned the decorating company to shop the floor, but after the completion of less than 3 months, the floor produced tile-like and panel paint cracking, and manufacturers and decorating companies are shirking their responsibilities. Recently, Nanhui District Court of First Instance ruling wood company returned Mr. Xu payment of 1.47 million yuan, and compensation for Mr. Xu floor replacement of the economic loss of 6,000 yuan; Mr. Xu returned to the purchase of the floor.
New floor tiles were in March last year, Mr. Xu commissioned a decoration company renovated new houses, floor decoration required by Mr. Xu is responsible for providing. In the same month, Mr. Xu ordered a solid wood flooring from a Shanghai Wood Company, and the flooring was installed by the decorating company according to the construction requirements.
In May the same year, renovation completed and submitted to the room. However, less than 3 months, Mr. Xu found that the floor produced tile-like and the surface of the paint cracking, etc., wood company home visits, that has nothing to do with themselves. Mr. Xu and wood companies, decorating company failed to negotiate, but also to the District Consumer Protection Committee complaints, but failed to resolve.
Related links:
wpc composite fence estimate Brunei

privacy fence cost calculator

new composite material floor Jordan


12/12/2016 7:57:09 AM   
Registration necessaryRegistration necessary
Pages: (1) [1] »
all Times are GMT +1:00
Thread-Info
AccessModerators
Reading: all
Writing: all
Group: general
none
Forum Overview » Beispiel-Kategorie / Example Category » Beispiel-Forum / Example Forum » Renovation after the floor cracking: is not paved or poor quality

.: Script-Time: 0.043 || SQL-Queries: 7 || Active-Users: 4,255 :.
Powered by ASP-FastBoard HE v0.8, hosted by cyberlord.at