Group: Administrator Level:
Posts: 4873 Joined: 1/28/2015 IP-Address: saved

| <P>The first step is to measure the size of the room, the calculation of the loss of wood flooring, the amount of good area after it began to restore the ground bump,timber pergola sizes that is, the so-called ground leveling, leveling the gap can not exceed 2mm error, if the ground leveling If you are not sure, there will be some gaps in the installation of the baseboard, which will also affect the installation of the whole floor.</P> <P>After the installation of the front of the wood flooring finished, and now began to buy your wood flooring disassembly, in accordance with the texture of the wooden floor of the regular display,wall cladding plastic panels in the process also to check whether the damage to the wood floor and cracking Signs and other issues, and then began to clean the ground, including every corner of the nautical should be clean, and then laying moisture mats, the role of the provision of moisture mats is to prevent the floor by the wet,discount deck lumber and moisture-proof mat laying is also Knowledge, the gap should be close together, can not leave any space.</P> <P>After the front of the wooden floor installation steps, now began to enter the wooden floor to install the center point. Laying the wooden floor looks simple and easy,panel de pared de garaje en moderno in fact, also need some technical skills and skills, first of all in the laying process should pay attention to the convergence of wood flooring, if the convergence of the place is not laid, it will produce bumps, and keel The installation must be fixed with a nail, in the fixed time, should always pay attention to whether the wooden floor raised, whether the cracks, the gap between the floor is too large and so on.</P>
|