Group: Administrator Level:
Posts: 4873 Joined: 1/28/2015 IP-Address: saved

| <p>length of the floor required for the first row of tail, set aside 8 to 12 mm after the expansion joints, saw off the excess. Saw less than 300 mm length of the floor as the second row of the floor of the blank, adjacent two rows of short joints between the floor is not less than 300 mm. The long side of the floor and the ground to maintain the </p> <p>appropriate angle into the slot, gently press to lock the floor. Geothermal floor: the basic installation method with the above two types of flooring, the difference is: ground moisture content should be ≤ 10%, or should be its natural air-drying, or heating and ventilation measures to speed up its drying rate. The use of the mat should be easy to </p> <p>heat, insulation, anti-aging. After the floor is installed, the surface temperature of the winter floor should not exceed 27 degrees. G, the pavement process requires the installation of the floor, the door and the door must be set to the corresponding height, to ensure the installation of the floor, or need to saw the door and the door. In the </p> " anti slip decking treatment , patio pavilion kits , wooden and plastic composite for ceiling , hollow decking and impact "
|