Group: Administrator Level:
Posts: 4873 Joined: 1/28/2015 IP-Address: saved

| superintendency means platoon to turn on the water of contaminant; (4) did not undertake pretreatment according to the regulation, to sewage concentration difference between flush floor and panel floor handles establishment to discharge what do not accord with the industrial waste water that handles craft demand; (5) one year internal cause exceeds a country or the pollutant discharge standard that the place sets discharges contaminant
to be carried out to press day how to install tongue and groove composite decking of successive punishment, exceed pollutant discharge standard to discharge contaminant again; (6) source of the pollution inside 30 days is online and automatic monitoring data accumulative total exceeds bid 5 days; (7) discharge illegally contain heavy metal, endurance the serious harm environment such as organic contaminant, composite deck railing green materials contaminant that damages human
body health exceeds pollutant discharge standard of 3 times above; (8) exceed key contaminant to discharge gross year to control index to discharge contaminant; 1 x 6 pressure treated tongue and groove floor boards (9) pollutant discharge standard still exceeds to discharge contaminant after the limitation that be instructed is produced; (10) because break out incident to cause contaminant to discharge,discharge a standard more than or key
|