Group: Administrator Level:
Posts: 4873 Joined: 1/28/2015 IP-Address: saved

|
The assembling, laying-out, handling, and setting of all seating in theatres, halls, churches, schools, banks, stadiums and open air theatres and other buildings or structures. All acoustical and decorative ceiling systems and related work in their entirety, regardless of material content, commonly known as Direct Hung Suspension System, Attached Concealed System without Backing Board, 42 Furring Bar Attached System, Furring Bar Suspension System, Indirect Hung System and any ceiling system that may evolve in the future; all backing board used in conjunction with ceiling systems. Lath work and related items, including gypsum lath, metal lath, and metal corner beads. wood plastic deck boards The installation of all prebuilt, either on-site, or off-site, light weight exterior component systems, such as but not limited to, EIFS System including all the metal framing, gypsum board, the insulation, and all attachment including all welding related to this work. When material is stock-piled in the working area, it shall then be handled by carpenters. The handling and installation of all mill and cabinet work.
Rigging into place and setting and aligning of laminated beams, posts, trusses or arches and composition panels, both interior or exterior, and modular or prefabricated structures; the handling and erection of metal buildings. Pile driving work, including the handling, driving, bracing, plumbing, cutting off and capping of piling, sheet piling, and tie backs whether of wood, metal or concrete, regardless of size or shape, the pulling, extracting or salvaging of such piling;garden fence panels and the cutting and placing of lagging. The placing of all whaling, spring and fender lines and guard rails of wood or metal; the framing, boring, drilling or burning of holes. The heading and splicing of wood piling, and making of wood sheet piling; the welding, cutting or burning of metal piling; the loading, unloading, framing, erecting, dismantling and handling of drivers, derricks, cranes and other pile driving equipment.
Underwater work on bulkheads, wharves, docks, caissons, bridges, viaducts and trestles, as well as salvage and reclamation work where divers are employed. Diver tendering. The installation of fibreglass reinforced plastic laminated-to-wood wall coverings. The laminating, cutting, gluing and installation of all plastic laminates such as Formica and Arborite. The application and/or installing of all insulation for weatherproofing or soundproofing applied by any means, wpc floor for sale when enclosed in steel or wood framed walls. The installation of all slot machine base cabinets, carousels and slot machines, and gaming tables. The installation of all fabric wrapped acoustical wall panels. The operation of forklifts for speciality contractors. Carpentry work related to the installation of vapour barrier. The installation of wood roof blocking. The tending of carpenters. The daily clean up associated with carpentry work.
|